Chicago Warehouse Loft
home officeWest Loop, Chicago2025

Chicago Warehouse Loft

1906 timber loft gutted by fire—only brick + beams survived.

Square Footage

2,400 sq ft

Budget Range

Over - 100K

Timeline

22 weeks

Completion

2025

The Challenge

1906 timber loft gutted by fire—only brick + beams survived.

Our Solution

Kept every scar, poured micro-topped concrete, ran black steel rails, and floated a 30-ft kitchen island like a freight car.

Transformation

After renovation
Before renovation

Drag the slider to see the transformation

The Process

Brick repoint → beam sandblast → steel fab → concrete pour → custom millwork → final grit.

Design Details

Materials

  • Re-claimed brick
  • Micro-top concrete
  • Hot-rolled steel
  • Blackened oak

Color Palette

#2C2C2C
#D4A574
#8B7355
#4A4A4A

Key Pieces

  • Custom 30-ft island
  • RH cloud sofa
  • Vintage factory pendants

Project Gallery

Brick scar
detail

Brick scar

Before: Fire damage
before

Before: Fire damage

After: Full expanse
after

After: Full expanse

Steel rail joint
detail

Steel rail joint

Friday pizza night
lifestyle

Friday pizza night

Beam patina
detail

Beam patina

Record spin
lifestyle

Record spin

Concrete pour seam
detail

Concrete pour seam

City lights dinner
lifestyle

City lights dinner

Pendant cluster
detail

Pendant cluster

Full loft flyover
after

Full loft flyover

Hidden pantry
detail

Hidden pantry

"We cook for 20 on a 30-ft island that used to be a loading dock. The bricks still smell like 1906, the beams carry scars like tattoos, and every dinner party ends with guests lying on the concrete staring up at the skyline. This isn’t a loft—it’s the city’s living room, and we’re just the hosts."
Luca & Amara RossiWest Loop, Chicago

Our Process

Brick repoint → beam sandblast → steel fab → concrete pour → custom millwork → final grit.

Materials & Finishes

Re-claimed brickMicro-top concreteHot-rolled steelBlackened oak

Key Furniture Pieces

  • Custom 30-ft island
  • RH cloud sofa
  • Vintage factory pendants

Project Details

Category

home office

Style

industrial

Location

West Loop, Chicago

Timeline

22 weeks

Ready to Start?

Let's discuss how we can bring your vision to life.

Get In Touch

Related Projects